Rublyovo-Arkhangelskaya line

Rublyovo-Arkhangelskaya line
Overview
Native nameРублёво-Архангельская линия
LocaleMoscow
Stations12
Service
TypeRapid transit
SystemMoscow Metro
Operator(s)Moskovsky Metropoliten
Technical
Line length18.7 kilometres (11.6 mi)
CharacterUnderground
Track gauge1,520 mm (4 ft 11+2732 in)
ElectrificationThird rail
Route map

Izumrudniye Kholmy
Krasnogorskaya
Ilyinskaya
Rublyovo-Arkhangelskoye
Lipovaya Roshcha
Strogino
Serebryanyy Bor
Bulvar Generala Karbysheva
Narodnoye Opolcheniye
Zvenigorodskaya
Shelepikha
Delovoy Tsentr
possible future connection with

Rublyovo-Arkhangelskaya line (Russian: Рублёво-Архангельская линия) or Line 17 of the Moscow Metro is currently under construction. It began in 2021 and will end after 2028, opening in three phases. Phase 1 is scheduled to be completed by 2026–2027 completing the section from Delovoy Tsentr to Lipovaya Roscha station, and phase two is scheduled to open after 2028 expanding the line from Lipovaya Roshcha to Ilyinskaya station. In the future, it will be connected with the Biryulyovskaya line.