Sabarmati Railway Station metro station
Sabarmati Railway Station | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Ahmedabad Metro station | |||||||||||
| General information | |||||||||||
| Location | Ram Nagar, Sabarmati, Ahmedabad, Gujarat 380005 | ||||||||||
| Coordinates | 23°04′11″N 72°35′16″E / 23.06979°N 72.58777°E | ||||||||||
| Owned by | Gujarat Metro Rail Corporation Limited | ||||||||||
| Operated by | Ahmedabad Metro | ||||||||||
| Line(s) | Red Line | ||||||||||
| Platforms | Side platform Platform-1 → Motera Stadium Platform-2 → APMC | ||||||||||
| Tracks | 2 | ||||||||||
| Connections | Sabarmati Junction | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated, Double track | ||||||||||
| Platform levels | 2 | ||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Status | Operational | ||||||||||
| History | |||||||||||
| Opening | 6 October 2022 | ||||||||||
| Electrified | 750 V DC third rail | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Sabarmati Railway Station is an important elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India. This metro station holds the main Sabarmati Junction railway station for passengers to depart towards Gandhinagar Capital in the northern side or towards Ahmedabad Junction in the southern side. This phase of the metro was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.