Santhià–Arona railway

Santhià–Arona railway
Overview
Statusno traffic
OwnerRete Ferroviaria Italiana
Termini
Stations8 station
Service
TypeHeavy rail
Operator(s)Trenitalia
History
Opened18 May 1906 (1906-05-18)
Technical
Line length65 km (40 mi)
Number of tracks1
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

km
0.000
Santhià
since 1856
181 m
5.128
Carisio
† 2003
178 m
Milan-Turin Autostrada
13.854
Buronzo
179 m
22.121
Rovasenda since 1939 / Rovasenda Alta
225 m
31.230
Gattinara
263 m
34.393
Romagnano Sesia
since 1883
266 m
44.897
Cureggio
296 m
from Novara
48.395
Borgomanero
since 1864
311 m
to Domodossola
51+279
start Gattico tunnel (3308 m)
 
54+587
57.588
Comignago
261 m
Dormelletto Paese
since 1935
26.724
Arona
since 1905
393 m
km
Source: Italian railway atlas

The Santhià–Arona railway is a railway line in Piedmont, Italy. It was inaugurated from 1905 to 1906.