NorthConnect
| NorthConnect | |
|---|---|
| Location | |
| Country | Norway United Kingdom (Scotland) |
| From | Samnanger, Norway |
| Passes through | North Sea |
| To | Peterhead, Aberdeenshire, Scotland (preliminary) |
| Ownership information | |
| Owner | NorthConnect |
| Partners | Agder Energi, Norway E-CO, Norway Lyse Energi, Norway Vattenfall, Sweden |
| Operator | NorthConnect |
| Construction cost | £1.3 billion |
| Technical information | |
| Type | submarine cable |
| Type of current | HVDC |
| Total length | 650 km (400 mi) |
| Power rating | 1,400 MW |
The NorthConnect (also known as Scotland–Norway interconnector) was a proposed 650 km (400-mile) 1,400 MW HVDC interconnector over the floor of the North Sea.