Second Niger bridge
| Second  Niger Bridge | |
|---|---|
| Second Niger bridge in Oct, 2022 | |
| Coordinates | 6°07′12″N 6°45′18″E / 6.1199°N 6.755°E | 
| Locale | Asaba, Nigeria | 
| Maintained by | Federal Ministry of Works and Housing | 
| Website | www | 
| Characteristics | |
| Total length | 1.63 km (1.01 mi) | 
| History | |
| Construction start | September 1, 2018 | 
| Construction end | May 23, 2023 | 
| Construction cost | ₦336 Billion | 
| Inaugurated | May 2023 | 
| Location | |
The Second Niger bridge is a Nigerian Federal Government project that is 1.6 km (0.99 mi) long and furnished with other ancillary infrastructure including a 10.3 km (6.4 mi) highway, Owerri interchange and a toll station all at Obosi city near Onitsha, inaugurated in March 2022. It opened for local traffic on December 15, 2022.