Shanghai–Suzhou–Huzhou high-speed railway

Shanghai–Suzhou–Huzhou
high-speed railway
沪苏湖高速铁路
Overview
Statusin operation as of 26 December 2024
LocaleShanghai, Jiangsu Province and Zhejiang Province, China
Termini
Stations8
Service
Operator(s)China Railway Shanghai Group
Technical
Line length163.8 km (101.8 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)
Route map

km
Nanxiang–Hejiawan railway from Hejiawan
Nanxiang
Shanghai EMU depot
Fengbang yard
Hongqiao yard
(start of this line)
Shanghai Hongqiao  2  10  17 
Shanghai South  1  3  15 
Qibao
Zhongchun Road  9 
Lijiatang
Xinzhuang  1  5 
Jinghong Road
Chunshen
Xinqiao (connect to Songjiang Tram T1 )
Jinshan railway to Jinshanwei
existing section of Shanghai–Kunming railway on left
new route through Shanghai Songjiang on right
Shanghai East-West Link from Shanghai East
Shanghai Songjiang  9 
Shanghai–Kunming HSR to Kunming South
Shihudang
Shanghai–Kunming railway to Kunming
Liantang
Suzhou South
Shengze
Huzhou Nanxun
Huzhou East
Huzhou
km

The Shanghai–Suzhou–Huzhou high-speed railway or Husuhu high-speed railway (沪苏湖高速铁路) is a high-speed railway in China. It was opened in December 2024.