Sherbino Wind Farm
| Sherbino Mesa Wind Farm | |
|---|---|
| Country | United States | 
| Location | Pecos County, Texas | 
| Coordinates | 30°48′39.6″N 102°21′43.2″W / 30.811000°N 102.362000°W | 
| Status | Decommissioned | 
| Decommission date | 
 | 
| Wind farm | |
| Type | |
| Power generation | |
| Units operational | 110 | 
| Make and model | Vestas V-90, Clipper Windpower C-96 | 
| Nameplate capacity | 300 MW | 
The Sherbino Mesa Wind Farm is located in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which has a potential capacity of 750 MW, is in operation. Phase I utilizes 50 Vestas V-90 Mk.5 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project.
Phase II, located on a 20,000-acre (8,100 ha) site 40 miles (64 km) west of Fort Stockton, utilizes 60 Clipper Windpower C-96 wind turbines, each with a rated capacity of 2.5 MW. This phase will be in operation by the end of 2011.