Keisei Matsudo Line
| Keisei Matsudo Line | |||
|---|---|---|---|
80000 series in January 2025 | |||
| Overview | |||
| Locale | Chiba Prefecture, Japan | ||
| Termini | |||
| Stations | 24 | ||
| Service | |||
| Type | Commuter rail | ||
| Operator(s) | Keisei Electric Railway | ||
| Depot(s) | Kunugiyama, Tsudanuma | ||
| Rolling stock | |||
| History | |||
| Opened | December 27, 1947 | ||
| Technical | |||
| Line length | 26.5 km (16.5 mi) | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
| Electrification | 1,500 V DC overhead catenary | ||
| Operating speed | 85 km/h (55 mph) | ||
| |||
The Keisei Matsudo Line (京成松戸線, Keisei-Matsudo-sen) is a railway line in Japan owned by Keisei Electric Railway. The line runs between Matsudo Station in Matsudo, Chiba, and Keisei-Tsudanuma Station in Narashino, Chiba.
The line, known as the Shin-Keisei Line from December 1947 until its merger with Keisei Electric Railway in April 2025, was operated by the Shin-Keisei Electric Railway.