Keisei Matsudo Line

Keisei Matsudo Line
80000 series in January 2025
Overview
LocaleChiba Prefecture, Japan
Termini
Stations24
Service
TypeCommuter rail
Operator(s)Keisei Electric Railway
Depot(s)Kunugiyama, Tsudanuma
Rolling stock
History
OpenedDecember 27, 1947
Technical
Line length26.5 km (16.5 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1,500 V DC overhead catenary
Operating speed85 km/h (55 mph)
Route map

The Keisei Matsudo Line (京成松戸線, Keisei-Matsudo-sen) is a railway line in Japan owned by Keisei Electric Railway. The line runs between Matsudo Station in Matsudo, Chiba, and Keisei-Tsudanuma Station in Narashino, Chiba.

The line, known as the Shin-Keisei Line from December 1947 until its merger with Keisei Electric Railway in April 2025, was operated by the Shin-Keisei Electric Railway.