Shijiazhuang–Taiyuan high-speed railway

Qingdao–Taiyuan
high-speed railway
Shijiazhuang–Taiyuan section
青太高速铁路石太段
Overview
OwnerChina Railway
LocaleHebei and Shanxi
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
History
OpenedApril 1, 2009 (2009-04-01)
Technical
Line length189 km (117 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Electrification50 Hz, 25,000 V
Operating speed250 km/h (160 mph)
Route map

km
Taiyuan
0
Taiyuan East
3
Shitai Railway to Taiyuan North
Donglingjing
Yangquan North
95
Taihang Tunnel (27.848 km)
Nanliang Tunnel (11.526 km)
Jingxing North
Shitai Railway to Taiyuan North
Huolu
212
Shiiazhuang North
225
Shijiazhuang
197
ShiDe Railway to Dezhou

The ShijiazhuangTaiyuan high-speed railway, or the Shitai passenger railway (simplified Chinese: 石太客运专线; traditional Chinese: 石太客運專線; pinyin: Shí-Tài Kèyùn Zhuān Xiàn) is a 190-kilometre long (120 mi) high-speed railway operated by China Railway High-speed, running from Shijiazhuang to Taiyuan, respectively the provincial capitals of Hebei and Shanxi, at 250 kilometres per hour (160 mph). The railway opened on April 1, 2009. It now forms part of the Qingdao–Yinchuan corridor.

The railway crosses the Taihang mountain range through the Taihang Tunnel, which, at almost 28 kilometres (17 mi) long, is (as of 2010) the longest railway tunnel in China.