| Siemens Charger | 
|---|
|  | 
|  | 
| | Specifications | 
|---|
 | Configuration: 
 |  | 
|---|
 | • AAR | B-B | 
|---|
 | • UIC | Bo′Bo′ | 
|---|
 | Gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | 
|---|
 | Trucks | Siemens model SF4 | 
|---|
 | Wheel diameter | 49–46 in (1,250–1,160 mm) (new–worn) | 
|---|
 | Minimum curve | 250 ft (76 m) | 
|---|
 | Wheelbase | 
9.8 ft (3 m) (per truck)40.8 ft (12.436 m) (between truck centers)
 | 
|---|
 | Length | 71.5 ft (21.793 m) | 
|---|
 | Width | 10 ft (3.048 m) | 
|---|
 | Height | 14.4 ft (4.39 m) | 
|---|
 | Axle load | 67,500 lb (30,600 kg) | 
|---|
 | Adhesive weight | 100% | 
|---|
 | Loco weight | 260,000 lb (120,000 kg) | 
|---|
 | Fuel type | Diesel | 
|---|
 | Fuel capacity | SC-44/SCB-40: 1,800 US gal (6,800 L; 1,500 imp gal)ALC-42/SCV-42: 2,200 US gal (8,300 L; 1,800 imp gal)
 | 
|---|
 | Prime mover | Cummins QSK95 | 
|---|
 | RPM range | 600–1,800 | 
|---|
 | Engine type | 45° V16, four stroke cycle | 
|---|
 | Aspiration | Turbocharger | 
|---|
 | Displacement | 95 liters (5,800 cu in) | 
|---|
 | Traction motors | Siemens 3-phase AC induction motors; 978 hp (729 kW) each | 
|---|
 | Head end power | 660 or 1,000 kW; 3φ, 60 Hz, 480 V AC | 
|---|
 | Cylinders | 16 | 
|---|
 | Cylinder size | 5.9375 liters (362.33 cu in) | 
|---|
 | Transmission | AC–DC–AC | 
|---|
 | Loco brake | Dynamic, regenerative, electropneumatic | 
|---|
 | Train brakes | Electropneumatic | 
|---|
 | Safety systems | Positive train control: ACSES II, I-ETMS | 
|---|
 | 
| | Performance figures | 
|---|
 | Maximum speed | 125 mph (200 km/h) | 
|---|
 | Power output | SC-42DM (3rd Rail): 2,100 hp (1,600 kW)SCB-40: 4,000 hp (3,000 kW)ALC-42/SCV-42/SC-42DM (Diesel): 4,200 hp (3,100 kW)SC-44: 4,400 hp (3,300 kW)
 | 
|---|
 | Tractive effort | Starting (Diesel): 290 kN (65,000 lbf)Continuous (Diesel): 275 kN (62,000 lbf) @ 16 mph (25 km/h)Starting (3rd Rail): 250 kN (56,000 lbf) to 12.5 mph (20 km/h)
 | 
|---|
 | Factor of adh. | 4.07 (24.57%) | 
|---|
 | 
| Data refers to the following except where noted: | 
The Siemens Charger is a family of diesel-electric/dual-mode passenger locomotives designed and manufactured by Siemens Mobility for the North American market.
There are five variants of the Charger, tailored for different operators and types of service: ALC-42 for Amtrak long-distance service, ALC-42E dual mode for Amtrak inter-city and long-distance routes that serve the Northeast Corridor, SC-44 for Amtrak state-supported inter-city service or commuter rail operators, SCB-40 for Brightline inter-city service and SCV-42 for VIA Rail inter-city service in Canada.
The first production Charger, an SC-44, was unveiled on March 26, 2016, and entered revenue service on August 24, 2017. It was followed by the SCB-40, which inaugurated Brightline service on January 13, 2018. The first ALC-42 was delivered to Amtrak on June 17, 2021, and entered revenue service on February 8, 2022, on the Empire Builder.
The Charger is often paired with Venture passenger cars, also built by Siemens, as part of a trainset.