Skydance Bridge
Skydance Bridge | |
|---|---|
The bridge in 2019 | |
| Coordinates | 35°27′23″N 97°31′03″W / 35.45650°N 97.51742°W |
| Carries | |
| Crosses | |
| Locale | Downtown Oklahoma City |
| Other name(s) |
|
| Named for | Scissor-tailed flycatcher |
| Owner | City of Oklahoma City |
| Maintained by | Oklahoma Department of Transportation |
| Website | www |
| Characteristics | |
| Design | Truss bridge |
| Material |
|
| Total length | 380 feet |
| Width | 20 feet |
| Height | 192 feet |
| History | |
| Architect | MKEC Engineering Consultants Inc. |
| Designer | S-X-L |
| Successful competition design | Butzer Design |
| Constructed by | Manhattan Road & Bridge Co. |
| Construction start | August 2011 |
| Construction end | April 2012 |
| Construction cost | $6.8 million |
| Opened | April 23, 2012 |
| Inaugurated | April 23, 2012 |
| Location | |
The Skydance Bridge (oftentimes called the Skydance Pedestrian Bridge or Scissortail Bridge) is a pedestrian bridge and public artwork in Oklahoma City, Oklahoma, United States.