Shanghai–Nanjing Riverside high-speed railway

Shanghai–Nanjing Riverside
high-speed railway
Overview
LocaleJiangsu, China
Termini
Stations8
Service
Operator(s)China Railway Shanghai Group
History
Opened28 September 2023 (2023-09-28)
Technical
Line length278.53 km (173.07 mi)
Number of tracks2
Operating speed350 km/h (220 mph)
0.000
Nanjing South
line connecting platforms 21 and 22, giving
a direct connection from Shanghai to Hefei
Nanjing South yard / Qinhuaihe yard
11.207
Jiangning
(HSR platforms not yet
under construction)
13.747
high-speed train depot
Nanjing–Huangshan HSR to Xuancheng
Yangzhou–Ma'anshan ICR from Ma'anshan South
38.695
Jurong
Yangzhou–Ma'anshan ICR to Yangzhou East
Yangshan tunnel
Jintan-Jiangyin viaduct
planned southeastern connecting line to Xuancheng
84.076
Jintan
LiyangZhenjiang–Xuancheng railwayZhenjiang
Gehu
122.670
Wujin
Yancheng–Yixing ICR from Yancheng
Xinyi–Changxing railway from Jiangyin North
164.010
Jiangyin
208.991
Zhangjiagang
228.732
Changshu
276.714
Taicang
Shanghai–Nanjing–Hefei HSR to Shanghai Baoshan
link to new section of Shanghai–Suzhou–Nantong railway
at Anting West
new section of Shanghai–Suzhou–Nantong railway
to Shanghai Baoshan, Shanghai East

The Shanghai–Nanjing Riverside high-speed railway (Chinese: 沪宁沿江高速铁路; pinyin: Hù–Níng Yánjiāng Gāosù Tiělù) is a high-speed railway line in Jiangsu, China. The line is 278.53 kilometres (173.1 miles) long and has a design speed of 350 kilometres per hour (220 mph). It is opened for operation on 28 September 2023.