Thorntonbank Wind Farm
| Thorntonbank Wind Farm | |
|---|---|
| Wind turbines D4 (nearest) to D1 on the Thornton Bank | |
| Country | 
 | 
| Location | 28 km north off the Belgian coast | 
| Coordinates | 51°33′06″N 2°58′01″E / 51.5516°N 2.9669°E | 
| Status | Operational | 
| Construction began | 
 | 
| Commission date | 
 | 
| Construction cost | € 1.3 billion | 
| Wind farm | |
| Type | |
| Max. water depth | 
 | 
| Distance from shore | 
 | 
| Rotor diameter | 
 | 
| Site area | 
 | 
| Power generation | |
| Units operational | 6 × 5 MW 48 × 6.15 MW | 
| Make and model | Senvion 6.2M126 (48) Senvion REpower 5M (6) | 
| Nameplate capacity | 
 | 
| External links | |
| Website | c-power | 
| Commons | Related media on Commons | 
The Thorntonbank Wind Farm (also known as C-Power) is an offshore wind farm. It is the first offshore wind farm in Belgium.
Electricity production started in early 2009, with a capacity of 30 MW. The capacity was increased to a total of 214 MW in 2012 and 325 MW in 2013.