USS Severn (1899)
United States Naval Academy Midshipmen furl sails aboard the ship in her period as Naval Academy training ship 1900–10 | |
| History | |
|---|---|
| United States | |
| Name | USS Chesapeake and USS Severn |
| Namesake |
|
| Builder | Bath Iron Works, Bath, Maine |
| Laid down | 2 August 1898 |
| Launched | 30 June 1899 |
| Sponsored by | Miss Elise Bradford |
| Commissioned | 12 April 1900 |
| Decommissioned | 3 October 1916 (final time) |
| Renamed | USS Severn, 15 June 1905 |
| Reclassified | submarine tender 1910 |
| Fate | Sold 7 December 1916 |
| General characteristics | |
| Type |
|
| Displacement | 1,175 long tons (1,194 t) |
| Length | 224 ft 3 in (68.35 m) |
| Beam | 37 ft (11 m) |
| Draft | 16 ft (4.9 m) |
| Propulsion | Sails plus auxiliary steam power |
| Sail plan | Three-masted full-rigged ship |
| Complement |
|
| Armament |
|
The third USS Chesapeake and second USS Severn was a three-masted, sheathed, wooden-hulled full-rigged ship with auxiliary steam power in commission in the United States Navy during most of the period between 1900 and 1916.