West Coast Highway, Singapore
| West Coast Highway | |
|---|---|
| Lebuhraya Pantai Barat (Malay) 西海岸大路 (Chinese) மேற்கு கடற்கரை நெடுஞ்சாலை (Tamil) | |
West Coast Highway is labelled in double yellow line | |
| Route information | |
| Length | 11 km (6.8 mi) |
| History | At-grade road widened in 2000 Viaduct completed in 2006 |
| Major junctions | |
| West end | West Coast |
| East end | Tanjong Pagar (AYE) |
| Location | |
| Country | Singapore |
| Highway system | |
West Coast Highway (Chinese: 西海岸大路; Malay: Lebuhraya Pantai Barat; Tamil: மேற்கு கடற்கரை நெடுஞ்சாலை) is a major arterial road in Singapore which links Jurong industrial estate and Clementi New Town to the city. It is an at-grade road from its junction with Pandan Loop and West Coast Road to its interchange with Pasir Panjang Road, where it becomes a grade-separated viaduct; the viaduct merges with Keppel Road before its interchange with Ayer Rajah Expressway. The total length of the highway is 11 km. The viaduct is newer than the at-grade section, having been completed in 2006.
Despite what its name may suggest, the speed limit on the highway is less than that of an expressway. The highway also has a few traffic light junctions, something that expressways do not have. The at-grade section of the highway is a three-lane dual carriageway, and the viaduct is a two-lane dual carriageway with a 1-metre hard shoulder. At a length of 5 km, the viaduct is the longest in Singapore.