Beijing Chaoyang railway station
Beijing Chaoyang railway station with the subway station under construction in September 2021 | |||||||||||||||||||||
| General information | |||||||||||||||||||||
| Other names | Xinghuo (1968-2019) | ||||||||||||||||||||
| Location | Chaoyang District, Beijing China | ||||||||||||||||||||
| Coordinates | 39°56′50″N 116°30′29″E / 39.94722°N 116.50806°E | ||||||||||||||||||||
| Line(s) |
| ||||||||||||||||||||
| Platforms | 1 side platform, 6 island platforms | ||||||||||||||||||||
| Construction | |||||||||||||||||||||
| Structure type | in level, elevated | ||||||||||||||||||||
| Other information | |||||||||||||||||||||
| Station code |
| ||||||||||||||||||||
| Classification | 2nd class station | ||||||||||||||||||||
| History | |||||||||||||||||||||
| Opened | 1968 (Old Railway Station) 22 January 2021 (New Railway Station) 15 December 2024 (Line 3 of Beijing Subway) | ||||||||||||||||||||
| Services | |||||||||||||||||||||
| |||||||||||||||||||||
| |||||||||||||||||||||
Beijing Chaoyang railway station (Chinese: 北京朝阳站; pinyin: Běijīng Cháoyáng Zhàn), formerly known as Xinghuo railway station (Chinese: 星火站; pinyin: Xīnghuǒ Zhàn), is a railway station in Chaoyang District, Beijing. This station is the main terminus of the Beijing–Harbin high-speed railway, and one of eight main passenger-service stations of the Beijing railway hub.