Xuzhou Metro
| Xuzhou Metro | |||
|---|---|---|---|
| Overview | |||
| Native name | 徐州地铁 | ||
| Owner | Xuzhou Metro Group | ||
| Locale | Xuzhou, Jiangsu, China | ||
| Transit type | Rapid transit | ||
| Number of lines | 3 (another 3 lines under construction) | ||
| Line number | 1 2 3 | ||
| Number of stations | 54 | ||
| Daily ridership | 256,700 (December 31, 2020 record) | ||
| Annual ridership | 7.5 million (2019) | ||
| Website | http://xzgdjt.com/ | ||
| Operation | |||
| Began operation | September 28, 2019 | ||
| Operator(s) | Xuzhou City Rail Transit Co., Ltd. | ||
| Character | Underground, elevated | ||
| Technical | |||
| System length | 72.48 km (45.04 mi) | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
| Electrification | 1.5 kV DC overhead lines | ||
| |||
The Xuzhou Metro (Chinese: 徐州地铁; pinyin: Xúzhōu dìtiě) is a rapid transit system in Xuzhou, Jiangsu Province, China. Construction began in February 2014, and Line 1 was opened on September 28, 2019, Line 2 was opened on November 28, 2020, and Line 3 was opened on June 28, 2021.
By 2020, the network is scheduled to comprise three lines with a total length of about 67 kilometres (42 mi). The total investment is expected to be 44.3 billion renminbi. The system is planned to comprise 11 lines and 323 kilometres (201 mi) of track when fully built out.
In its first year of operation the ridership was 7.5 million (2019).