Xuzhou Metro

Xuzhou Metro
Overview
Native name徐州地铁
OwnerXuzhou Metro Group
LocaleXuzhou, Jiangsu, China
Transit typeRapid transit
Number of lines3 (another 3 lines under construction)
Line number 1   2   3 
Number of stations54
Daily ridership256,700 (December 31, 2020 record)
Annual ridership7.5 million (2019)
Websitehttp://xzgdjt.com/
Operation
Began operationSeptember 28, 2019 (2019-09-28)
Operator(s)Xuzhou City Rail Transit Co., Ltd.
CharacterUnderground, elevated
Technical
System length72.48 km (45.04 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1.5 kV DC overhead lines

The Xuzhou Metro (Chinese: 徐州地铁; pinyin: Xúzhōu dìtiě) is a rapid transit system in Xuzhou, Jiangsu Province, China. Construction began in February 2014, and Line 1 was opened on September 28, 2019, Line 2 was opened on November 28, 2020, and Line 3 was opened on June 28, 2021.

By 2020, the network is scheduled to comprise three lines with a total length of about 67 kilometres (42 mi). The total investment is expected to be 44.3 billion renminbi. The system is planned to comprise 11 lines and 323 kilometres (201 mi) of track when fully built out.

In its first year of operation the ridership was 7.5 million (2019).