Yellow Line (Agra Metro)

Yellow Line
Yellow Line train at Mankameshwar Temple station
Overview
StatusPartially Operational
LocaleAgra, Uttar Pradesh, India
Termini
Stations13
6 (operational)
Service
TypeRapid Transit
SystemAgra Metro
Operator(s)Uttar Pradesh Metro Rail Corporation
Rolling stockAlstom - Bombardier Movia
History
Opened6 March 2024
Technical
Line length14.25 km (8.85 mi)
6.5 km (4.0 mi) (operational)
Characterunderground and elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (maximum)
  • 34 km/h (21 mph) (average)
Route map

Sikandra
Guru Ka Taal
ISBT
RBS College
Raja Ki Mandi
Agra College
Medical College
Mankameshwar
Dr. Ambedkar Chowk
Taj Mahal
Fatehabad Road
Shaheed Captain Shubham Gupta
Taj East Gate

The Yellow Line (Line 1) (Hindi: येलो लाइन) is a partly operational metro rail line of the Agra Metro, a rapid transit system in Agra, Uttar Pradesh, India. The 6.5 km section of the line was inaugurated by PM Modi on 6 March 2024. Once complete, it will connect Sikandra to Taj East Gate by the distance of 14.25 km.