Yellow Line (Ahmedabad Metro)
| Yellow Line | |
|---|---|
| Overview | |
| Status | Partially operational |
| Locale | Gandhinagar |
| Termini | |
| Stations | 21 (14 Operational) |
| Service | |
| Type | Rapid transit |
| System | Ahmedabad Metro |
| Operator(s) | Gujarat Metro Rail Corporation Limited |
| Rolling stock | Hyundai Rotem |
| History | |
| Opened | 16 September 2024 (Sector-1 to GNLU and Motera Stadium) |
| Technical | |
| Line length | 23.84 km (14.81 mi) |
| Character | Elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) (Standard gauge) |
| Electrification | 750V DC Third Rail |
The Yellow Line of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India.