Bombardier Innovia APM 300R C801B

Alstom Innovia APM 300R C801B
A C801B two-car set approaching Bukit Panjang LRT station.
Interior of a C801B car
Stock typeRubber-tyres automated people mover
In service1 August 2024 (2024-08-01) – present
ManufacturerCRRC Nanjing Puzhen Alstom Transportation Systems (Alstom [formerly Bombardier Transportation] and CRRC Nanjing Puzhen Company)
Built atWuhu, Anhui, China
Family nameInnovia APM
ReplacedBombardier Innovia APM 100 C801
Constructed2019 –
Entered service1 August 2024 (2024-08-01)
Number built19 vehicles
Number in service13 vehicles
FormationSingle vehicles (M) that can be coupled to form 2-car trains
Fleet numbers133 – 151
Capacity22 seated; 83 standing
OperatorsSMRT Trains Ltd (SMRT Corporation)
DepotsTen Mile Junction
Lines served BPLRT  Bukit Panjang LRT line
Specifications
Car body constructionAluminum
Train length12.8 m (41 ft 11+78 in)
Car length12.8 m (41 ft 11+78 in)
Width2.8 m (9 ft 2+14 in)
Height3.4 m (11 ft 1+78 in)
Doors2 × 2 per car
Maximum speed55 km/h (34 mph) (design)
48 km/h (30 mph) (service)
Traction systemAlstom MITrac (500 series) IGBTVVVF
Electric system(s)600 V 50 Hz 3-phase AC third rail
Current collector(s)Collector shoe
UIC classificationAA
Safety system(s)Alstom Cityflo 650 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI
Coupling systemDellner
Multiple workingWithin type during regular service
Headlight typeTriangular LED
Track gauge2,642-millimetre (8 ft 8 in) central guideway with rubber tyres

The Alstom Innovia APM 300R C801B (APM 300R) is the third generation of automated people mover (APM) trains built by a joint venture of Alstom (formerly Bombardier Transportation) and CRRC Nanjing Puzhen Company) for the Bukit Panjang LRT line (BPLRT), Singapore, to replace the existing C801 trains built in 1999. The C801B trains are also the first of their kind to use AC third rail shoes, in contrast with the newer light rail lines around the world that utilise the APM 300 system built with DC third rail.