Changping South railway station
Platform  | |||||||||||
| Chinese name | |||||||||||
| Chinese | 常平南站 | ||||||||||
  | |||||||||||
| General information | |||||||||||
| Location | Changping Boulevard (常平大道), Banshi Estate (板石村), Changping, Dongguan, Guangdong China  | ||||||||||
| Coordinates | 22°58′41″N 114°00′09″E / 22.978056°N 114.0025°E | ||||||||||
| Owned by | Pearl River Delta Metropolitan Region intercity railway | ||||||||||
| Operated by | Guangdong Intercity Railway Operation Co., Ltd. | ||||||||||
| Line(s) | Guangzhou–Huizhou intercity railway | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Underground | ||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Station code | FPQ (Pinyin: CPN) | ||||||||||
| History | |||||||||||
| Opened | 28 December 2017 | ||||||||||
| Services | |||||||||||
  | |||||||||||
Changping South railway station (Chinese: 常平南站; pinyin: Chángpíng Nán Zhàn; Jyutping: Soeng4ping4 Naam4 Zaam6) is a railway station in Changping, Dongguan, Guangdong, China. It opened on 28 December 2017.
The station has 4 exits planned, lettered A-D. Exits A and D opened when the station opened. Exit B has been built but not opened, and Exit C, which has not yet started construction, is reserved for connecting to a future Dongguan Rail Transit station. In addition, there is a passage connecting to Xianglong Tiandi Plaza next to Exit A, but it is currently temporarily closed due to the latter's inadequate fire safety requirements.