Chengdu–Chongqing railway 成渝铁路 |
|---|
|
Line in Jianyang |
|
| Status | Active |
|---|
| Termini | |
|---|
|
| Type | Heavy rail |
|---|
| Operator(s) | China Railway |
|---|
|
| Commenced | June 15, 1950 (1950-06-15) |
|---|
| Completed | June 13, 1952 (1952-06-13) |
|---|
|
| Line length | 505 km (314 mi) |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
|---|
| Electrification | 25 kV/50 Hz AC overhead catenary |
|---|
|
|
|
|
|
km |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
Chengdu |
|
|
|
|
Bali |
|
|
|
|
|
|
|
|
10 |
Longtansi |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Shibantan |
| Changlin crossing loop |
|
|
|
|
|
|
|
|
|
|
|
|
|
Honganxiang |
|
|
|
36 |
Chenjiawan |
|
|
|
|
Honghuatang |
|
|
|
|
Wufengxi |
|
|
|
|
Lingxianmiao |
|
|
|
|
Yangmahe |
|
|
|
|
Shiqiaozhen |
|
|
|
83 |
Jianyang |
|
|
|
|
Miaozigou |
|
|
|
105 |
Linjiangsi |
|
|
|
|
Mochiba |
|
|
|
122 |
Ziyang |
|
|
|
|
Houjiaping |
|
|
|
|
Cheungshagen |
|
|
|
149 |
Shunhechang |
|
|
|
|
Dengyingya |
|
|
|
|
Guidexiang–Lianjie railway from Lianjie |
|
|
|
|
Guidexiang |
|
|
|
|
Taojiagou |
|
|
|
189 |
Zizhong |
|
|
|
|
Zizhong–Weiyuan railway from Songjiapu |
|
|
|
|
Maodianzi |
|
|
|
|
Yinshanzhen |
|
|
|
|
Shijiaxiang |
|
|
|
219 |
Neijiang |
|
|
|
|
|
|
|
|
|
Neijiang East |
|
|
|
231 |
Beimuzhen |
|
|
|
240 |
Shuangfengyi |
|
|
|
249 |
Yingxiangjie |
|
|
|
257 |
Longchang |
|
|
|
|
Longchang–Huangtong railway to Luzhou |
|
|
|
|
Shiyanqiao |
|
|
|
272 |
Lishizhen |
|
|
|
279 |
Anfuzhen |
|
|
|
286 |
Guangshunchang |
|
|
|
292 |
Rongchang |
|
|
|
303 |
Fenggaopu |
|
|
|
311 |
Dazu |
|
|
|
319 |
Changhebian |
|
|
|
329 |
Shuangshiqiao |
|
|
|
339 |
Yongchuan |
|
|
|
|
Langantan |
|
|
|
354 |
Linjiangchang |
|
|
|
362 |
Bailin |
|
|
|
370 |
Ciba |
|
|
|
380 |
Zhuyangxi |
|
|
|
391 |
Pingdeng |
|
|
|
402 |
Baisha |
|
|
|
411 |
Jingangtuo |
|
|
|
420 |
Youxi |
|
|
|
429 |
Gujiatuo |
|
|
|
439 |
Jiangjin |
|
|
|
450 |
Huangqian |
|
|
|
460 |
Tongguanyi |
Moujia crossing loop |
|
|
|
| Xinglongchang–Luohuang railway, | | Tongguanyi branch to Taojia | |
|
|
|
468 |
Shichang |
|
|
|
|
| Xinglongchang–Luohuang railway | | from Xinglongchang via Taojia | |
|
|
|
|
|
|
|
|
|
| Xiaonanhai–Lishuwan railway | | from Lishuwan via Tiaodeng | |
|
|
|
|
link to Tiaodeng |
|
|
|
|
|
|
|
|
|
|
| New Baishatuo Yangtze | | River Railway Bridge | ↗ |
|
|
471 |
Xiaonanhai |
|
|
|
477 |
Funiuxi |
|
|
|
483 |
Qiezixi |
|
|
|
488 |
Dadukou |
|
|
|
492 |
Luozhongzi |
|
|
|
497 |
Chongqing South |
|
|
|
501 |
Huangshaxi |
|
|
|
|
|
|
|
|
504 |
Chongqing |
|
|
|
km |
|
|
|
|
|
|
|
|
|
|
|
|
Chengdu–Chongqing railway or Chengyu railway (simplified Chinese: 成渝铁路; traditional Chinese: 成渝鐵路; pinyin: chéngyú tiělù), is a single-track electrified railroad in the Sichuan Basin of Southwest China between the cities Chengdu and Chongqing. Chongqing's short form name is Yu (渝) and the railway is named after the two cities. The line has a total length of 505 km (314 mi).
The Chengyu railway opened in 1952 and was the first railway to be built after the founding of the People's Republic of China. Other cities along the route include Jianyang, Ziyang, Zizhong, Neijiang, Longchang and Yongchuan. The line is single-track, but duplication commenced between Chongqing and Jiangjin in November 2019.