Line 17 (Beijing Subway)

Line 17
A CCD5035 train reversing at Jiahuihu station
Overview
Other name(s)M17 / R2 (planned name)
StatusPartly in operation
TerminiWeilaikexuechengbei (Future Science City North) - Workers' Stadium (North section)
Shilihe - Jiahuihu (South section)
Stations9 (North section)
7 (South section)
21 (Total)
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing MTR Corporation Limited
Depot(s)Ciqunan and Xiejiacun
Rolling stock8-car Type A
History
Opened31 December 2021 (2021-12-31) (South)
30 December 2023 (2023-12-30) (North)
2025 (Middle)
Technical
Line length25 km (16 mi) (North section)
15.8 km (9.8 mi) (South section)
49.7 km (30.9 mi) (Total)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph)
Route map

Weilaikexuechengbei (Future Science City North)
Wenyu river
Weilaikexuecheng (Future Science City)
Xiejiacun depot
Tiantongyuandong
Qing river
Qingheying
Line 13 crossing
Shuangsha railway crossing
Hongjunying
Beixiao river
line 13 Xizhimen
Wangjingxi
line 13 Dongzhimen
Taiyanggong
outer – inner
Ba river
Xibahe
connects line 12
Zuojiazhuang
Liangma river
Workers' Stadium
connects line 3
Dongdaqiao
Pinggu line (opens 2027)
Pinggu
Line 28 (opens 2029)
Guangqudonglu
Yong'anli
Tonghui river
Guangqumen Wai
Panjiayuanxi
Shilihe
inner – outer
Zhoujiazhuang
Shibalidian
Fengshuang railway
Beishenshu
Tonghui irrigate canal
Ciqubei
Ciqu
Ciqunan yard
Jiahuihu

Line 17 of the Beijing Subway (Chinese: 北京地铁17号线; pinyin: běijīng dìtiě shíqī hàoxiàn) is a rapid transit line that is partially in operation in Beijing. The line is fully underground and has a total length of 49.7 km (30.9 mi). It is scheduled to open in parts between 2021 and 2025. The line is operated by Beijing MTR Corporation Limited. Line 17's color is turquoise.

The south section of Line 17 opened on 31 December 2021. The north section of Line 17 opened on 30 December 2023 (except Wangjingxi), while the middle section of Line 17 is expected to open in 2025.