Line 28 (Beijing Subway)

Line 28
 28 
Construction site in February 2021
Overview
Other name(s)M28 (planned name)
CBD line
StatusUnder construction
LocaleChaoyang district
Beijing
Termini
Stations9
Service
TypeRapid Transit
SystemBeijing Subway
Rolling stock6-car Type LB
History
Planned opening2029 (2029) (planned)
Technical
Line length8.877 km (5.516 mi) (Phase 1)
CharacterUnderground
Operating speed80 km/h (50 mph)
Route map

Dongdaqiao
Jintai Xizhao
inner – outer
Pinggu
Guanghualu
Hexinqu
Dawang Lu
Line 14
Tonghui River
Beijing East railway station
Dajiaoting
Guangqulu
Guangqudonglu
Guangqudonglu depot

Line 28 of the Beijing Subway (Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a rapid transit line under construction in Beijing. It was formerly known as CBD line.

Construction started in July 2021. It is planned to open in 2029.