Line 17 (Chengdu Metro)

Line 17
17
Line 17 train entering Huangshi station
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations3
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Wutongmiao Depot (五桐庙停车场)
History
Opened18 December 2020 (2020-12-18)
Technical
Line length5.486 km (3.4 mi) (in operation)
Number of tracks2
Characterunderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationOverhead line, 25 kV 50 Hz AC
Operating speed140 km/h

Line 17 of the Chengdu Metro is a metro line in Chengdu. The whole line will be 30.286 km when Phase 2 opens. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.

Phase 1 runs from Jinxing station in Wenjiang District to Jitouqiao station in Wuhou District. Phase 1 is 26.145 km long with 5.5 km running elevated and 20.6 km running underground. There are 9 stations with 2 elevated stations and 7 underground stations.

Phase 2, currently under construction, will extend the line west across central Chengdu to Gaohong station. It will be 24.8 km long, all underground with 18 additional stations.