Line 1 (Wuhu Rail Transit)

Line 1
Overview
StatusOperational
LocaleWuhu, Anhui, China
Termini
  • Baoshunlu
  • Baimashan
Stations25
Service
TypeStraddle-beam monorail rapid transit
SystemWuhu Rail Transit
Services1
Depot(s)
  • Baoshun Parking Lot
  • Baimashan Depot
Rolling stockBombardier INNOVIA Monorail 300
Daily ridership96,400 passengers (peak) (1 January 2022)
History
Opened3 November 2021 (2021-11-03)
Technical
Line length30.46 km (18.93 mi)
Number of tracks2
CharacterElevated
Operating speed80 km/h (50 mph)
Route map

Baonshun Parking Lot
Baoshunlu
Panda River
Huashanlu
Taishanlu
Hengshanlu
Longshanlu
Anshanlu
Gangwanlu
Yu'anlu
Silver Lake
Wuyishanlu
Gangyilu
district
Jiujiang
Jinghu
Zhujiaqiao Wharf special line crossing
Tianzhushanlu
Banchenglong
Tianmenshanlu
Chizhushanlu
Baoxinglong
Zheshanlu
Zheshangongyuan
Zhongshanbeilu
Jiuziguangchang  2 
Wanchun Wake Road 
Huanchengbeilu
Aotizhongxin
Honghuashanlu
Bolanzhongxin
Wenjindonglu
Henglangshanlu
Wuhunan Railway Station
Baimashan
Baimashan Depot

Line 1 of Wuhu Rail Transit (Chinese: 芜湖轨道交通1号线; pinyin: Wúhú guǐdào jiāotōng yīhàoxiàn) consists of 25 stations (all elevated stations) and 30.46 kilometres (18.93 mi) of track between Baoshunlu station in the north and Baimashan station in the south. It opened on 3 November 2021.