Line 25 (Shenzhen Metro)

Line 25
25
Overview
StatusUnder construction
LocaleShenzhen, Guangdong
Termini
  • Jihua Hospital (Phase 1)
    Future: Wenjindu
  • Shilong (Phase 1)
    Future: Shiyan
Stations14 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
History
Planned opening2028 (2028)
Technical
Line length16.2km (Phase 1)
CharacterUnderground
Operating speed80km/h

Line 25 of the Shenzhen Metro is a line under construction, which will connect across Shenzhen through the districts of Luohu, Longhua, Longgang and Bao'an for 38.5 kilometers and 30 stations. Construction began on 26 February 2024, and the line is expected to open in 2028. The first phase of Line 25 will run from Jihua Hospital in Longgang District to Shilong in Bao'an District, with 14 stations and 16.2 kilometers of track. The line is proposed to use 6 car type B trains.