Line 2 (Dongguan Rail Transit)

Line 2
 2 
Overview
Other name(s)R2
StatusIn operation
LocaleDongguan, China
Termini
Stations15 (in operation)
Service
TypeRapid transit
SystemDongguan Rail Transit
Operator(s)Dongguan Rail Transit Corporation, Limited
Rolling stock6-car Type B by CRRC Nanjing Puzhen & Bombardier Transportation
History
Opened27 May 2016 (2016-05-27)
Technical
Line length37.7 km (23.43 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed120 km/h designed, operating maximum 110km/h

Line 2 of the Dongguan Rail Transit (Chinese: 东莞轨道交通2号线; pinyin: Dōngguǎn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line in Dongguan. The line currently has 15 stations and is 37.743 kilometres (23.452 mi) long, from Dongguan railway station to Humen railway station. It opened on 27 May 2016. Construction of Line 2 began in 2010.