Line 2 (Shaoxing Metro)
| Line 2 | |
|---|---|
| 2 | |
| Line 2 train at Tandu station | |
| Overview | |
| Status | Operational | 
| Locale | Shaoxing, Zhejiang, China | 
| Termini | 
 | 
| Stations | 9 | 
| Service | |
| Type | Rapid transit | 
| System | Shaoxing Metro | 
| Operator(s) | Shaoxing Metro Corporation | 
| Rolling stock | PM201 | 
| History | |
| Opened | 26 July 2023 | 
| Technical | |
| Line length | 10.55 km (6.56 mi) | 
| Character | Underground | 
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | 
| Operating speed | 100 km/h (62 mph) | 
Line 2 of Shaoxing Metro (Chinese: 绍兴轨道交通2号线) is a metro line in Shaoxing, Zhejiang Province, China. The line runs in the main urban area, with a total length of 10.55 kilometers and 9 stations.
Line 2 was approved by the State Council in mid-2016 with the first round of the Shaoxing Metro construction plan. Construction started on 1 March 2020, and the line was officially opened for operation on 26 July 2023. The line uses 4-car trains initially and would have mixed operations of 4 and 6-car trains in the long term.