Line 5 (Nanjing Metro)

Line 5
 5 
Overview
Statusin operational
LocaleJiangning district
Nanjing, Jiangsu
Termini
Stations9
Service
TypeRapid transit
History
Opened31 March 2024 (2024-03-31)
Technical
Line length12.9 km (8.0 mi) (in operation)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (Maximum)

Line 5 is a northwest–southeast line in Nanjing Metro. The line color is yellow, and it was first opened on March 31, 2024.

Due to track construction works, line 5 suspended its operation since 1 January 2025, and resumed on 12 March.