Line 3 (Jinan Metro)
| Line 3 | |
|---|---|
| A train of Jinan Metro Line 3 | |
| Overview | |
| Other name(s) | R3 (construction name) | 
| Status | operating | 
| Locale | Jinan | 
| Termini | 
 | 
| Stations | 18 | 
| Service | |
| Type | rapid transit | 
| System | Jinan Metro | 
| Rolling stock | 6-car Type B | 
| History | |
| Opened | 28 December 2019 | 
| Technical | |
| Line length | 33.675 km (20.9 mi) (Future: 34.328 km (21.3 mi)) | 
| Character | underground | 
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | 
| Operating speed | 100 km/h (62 mph) | 
| Line 3 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 
 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Jinan Metro Line 3 (Chinese: 济南地铁3号线; pinyin: Jǐnán Dìtiě Sān Hào Xiàn) is a rapid transit line in Jinan, China. The line use six-car Type B rolling stock. The line is 33.675 kilometres (20.9 miles) long. It is completely underground.
Phase 1 of Line 3 was opened on 28 December 2019. Phase 2 of Line 3 opened on 22 November 2024 (Jichangbei station is still under construction).