Nal Stop metro station

Nal Stop
Pune Metro station
General information
LocationPune
Coordinates18°30′26″N 73°49′43″E / 18.50725°N 73.82867°E / 18.50725; 73.82867
Owned byMaharashtra Metro Rail Corporation Limited (MAHA-METRO)
Operated byPune Metro
Line(s)Aqua Line
PlatformsSide platform
Platform-1 → Ramwadi
Platform-2 → Vanaz
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes
Other information
Station codeNST
History
Opened6 March 2022 (2022-03-06)
Electrified25 kV 50 Hz AC overhead catenary
Services
Preceding station Pune Metro Following station
Ideal Colony
towards Vanaz
Aqua Line Garware College
towards Ramwadi
Location

Nal Stop is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro and was the first to be completed. From March 2022 to August 2023, the Aqua Line was operational between Vanaz and Garware College. The extended section between Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023. So the metro operated from Vanaz to Ruby Hall Clinic. Later the remaining stretch was completed and the line operates till Ramwadi from 6 March 2024.