Oregon City-class cruiser
| USS Rochester on 20 September 1953 | |
| Class overview | |
|---|---|
| Name | Oregon City class | 
| Builders | Bethlehem Steel Corporation, Fore River Shipyard | 
| Operators | United States Navy | 
| Preceded by | Baltimore class | 
| Succeeded by | Des Moines class | 
| Subclasses | Albany class | 
| Built | 1944–1951 | 
| In commission | 1946–1961 | 
| Planned | 10 | 
| Completed | 4 | 
| Cancelled | 6 | 
| Retired | 4 | 
| General characteristics | |
| Type | Heavy cruiser | 
| Displacement | 13,260 long-tons (standard) | 
| Length | |
| Beam | 70 ft 10 in (21.59 m) | 
| Draft | 26 ft 4 in (8.03 m) | 
| Propulsion | General Electric steam turbines turning 120,000 hp (89,000 kW) | 
| Speed | 32.4 knots (60.0 km/h; 37.3 mph) | 
| Boats & landing craft carried | 2 × lifeboats | 
| Complement | 1,142 officers and enlisted | 
| Sensors & processing systems | |
| Armament | 
 | 
| Armor | 6 Inch belt armor | 
| Aircraft carried | 4 × Vought OS2U Kingfishers | 
| Aviation facilities | 
 | 
The Oregon City-class was a class of heavy cruisers of the United States Navy. Although ten ships of this class were planned, only four were completed – one of those as a command ship. The three ships completed as cruisers were in commission from 1946 to 1980, one having been converted to a guided missile cruiser (CG).