Qingdao–Jinan railway

Qingdao–Jinan railway
胶济铁路
Qingdao port area in the 1910s
Overview
StatusOperational
LocalePeople's Republic of China
Termini
Stations36
Service
TypeHeavy rail
SystemChina Railway
Operator(s)China Railway
History
Opened1904
Technical
Line length384.2 km (238.7 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25 kV
Operating speed200 km/h (124 mph)
Route map

km
Jinan South
Jinan passenger
transport depot
Jinan
locomotive depot
384.2
Jinan
(end of line)
Jinan Railway to Qiaonan & Beijing
Old Jinan station
380.8
Daminghu
378.6
Huangtai
Huangtaiqiao branch to Huangtaiqiao Port (
closed
1944
)
377
Licheng North
Hancang
370
Guodian
Yujiacun
359
Pinglingcheng
Biyang
Zaoyuan
(closed 2006)
Quanzhuang
344
Zhangqiu
336
Gaojiapo
330
Puji
(closed 2006)
324
Wangcun
Pengjiazhuang
(closed 2006)
Chitou
301
Zhoucun
(passenger services closed 2003)
Yazhuang
289
Mashang
(passenger services closed 1988)
Zibo–Boshan railway to Boshan
269.5
Zibo
Zibo locomotive depot
Hutian
Jinlin–Tieshan line (now siding)
Jinlinzhen
Dongfeng
Xindian–Taian railway to Laiwu & Tai'an
261
Linzi
(passenger services closed 2005)
255
Zihedian
(closed 2003)
248
Putong
(passenger services closed 2008)
240
Qingzhou South
(passenger services closed 2008)
Yiyang Railway to Yangkou & Dajiawa
Qinglin Railway to Linqu & Yeyuan
229
Yangjiazhuang
222
Tanjiafang
214
Yaogou
207
Changle
198
Zhuliudian
192
Weifang West
183
Weifang
163
Weifang East
Beiliu
150
Nanliu
Fangzi branch
(part of the line before doubling)
146
Huangqibao
140
Zuoshan
134
Taibaozhuang
(closed 2003)
114
Caijiazhuang
(closed 1996)
107
Kangjiazhuang
(closed 2003)
98.7
Gaomi
91
Yaogezhuang
Zhilanzhuang
80
Taishang
72.3
Jiaozhou
Jiaozhou–Huangdao railway to Huangdao
Qingdao–Yancheng railway to Yancheng
64
Jiaodong
(closed 2003)
57
Lancun West
52
Lancun
Jimo
(passenger services closed 2007)
works link to CRRC Qingdao Sifang
35
Hanwa
(closed 1980s)
31
Chengyang
(reopened on 1 July 2022)
25
Nügukou
(closed 2013)
22
Loushan
17
Cangkou
(closed 2013)
15.4
Qingdao North
11.1
Shalingzhuang
Qingdao North EMU Depot
6.7
Sifang
(passenger services closed 2008)
Dagang-Shugang railway
3
Dagang
(closed 2006)
0.0
Qingdao
km

The Qingdao–Jinan railway or Jiaoji Railway (simplified Chinese: 胶济铁路; traditional Chinese: 膠濟鐵路; pinyin: Jiāojì Tiělù, formerly the Shantung Railway) is a railway in Shandong Province, China. The railway is 393 kilometres (244 mi) in length and connects Qingdao, on the Jiaozhou Bay, and Jinan, the provincial capital of Shandong. Adolph von Hansemann and other German financiers funded construction of the railway, then known as Schantung Eisenbahn Gesellschaft (Shantung Railway Company), which began September 23, 1899, and was completed in 1904. Since the quadruple tracking of this corridor with the opening of the parallel Qingdao–Jinan passenger railway, the line is mostly used for freight with some conventional passenger services.