Songgang station

Songgang

松岗
Line 11 platform
Chinese name
Traditional Chinese松崗
Simplified Chinese松岗
Transcriptions
Standard Mandarin
Hanyu PinyinSōnggǎng
Yue: Cantonese
JyutpingCung4 Gong1
General information
LocationBao'an District, Shenzhen, Guangdong
China
Coordinates22°46′41″N 113°52′10″E / 22.77806°N 113.86944°E / 22.77806; 113.86944
Operated bySZMC (Shenzhen Metro Group)
Shenzhen Line 12 Rail Transit Co., Ltd (Shenzhen Metro Group and PowerChina PPP)
Line(s)
Platforms8 (2 island platforms and 4 side platforms)
Tracks6
Construction
Structure typeUnderground
AccessibleYes
History
OpenedLine 11: 28 June 2016 (2016-06-28)
Line 6: 18 August 2020 (2020-08-18)
Line 12: 28 December 2024 (2024-12-28)
Services
Preceding station Shenzhen Metro Following station
Terminus Line 6 Xitou
Bitou
Terminus
Line 11 Houting
Terminus Line 12 Langxia

Songgang station (simplified Chinese: 松岗站; traditional Chinese: 松崗; pinyin: Sōnggǎng; Jyutping: Cung4 Gong1) is an interchange station between Line 6, Line 11 and Line 12 of the Shenzhen Metro. Line 11 platforms opened on 28 June 2016, Line 6 platforms opened on August 18, 2020 and Line 12 platforms opened on 28 December 2024.