Taipa line

Taipa Line
An operating train
Overview
StatusIn Operation
OwnerMacau
LocaleSão Lourenço, Freguesia de Nossa Senhora do Carmo and Zona do Aterro de Cotai,
Macau, China
Termini
Stations13
Service
TypeAutomated guideway transit/People mover
SystemMacau Light Rapid Transit
Services1
Operator(s)Macau Light Rapid Transit
History
Opened10 December 2019
Technical
Line length12.5 km (7.77 mi)
Number of tracks2
CharacterElevated, At-grade & Underground
Route map

( West Line to Border Gate)
( Península line to Border Gate)
Barra
Sai Van Bridge lower deck
Ocean
Jockey Club
Stadium
Pai Kok
Cotai West
( Hengqin extension line to Hengqin Checkpoint)
Lotus
Union Hospital
East Asian Games
Cotai East
Macao LRT Depot
MUST
Airport
Taipa Ferry Terminal
( East Line to Border Gate)

The Taipa line (Chinese: 氹仔線; Jyutping: tam5 zai2 sin3; Portuguese: Linha da Taipa) is the first line in Macau Light Rapid Transit. The line initially opened on 10 December 2019, providing service between Ocean and Taipa Ferry Terminal as the first phase of the Taipa line. The automated guideway transit line has a U-shaped route within the island of Taipa and currently connects 13 stations; a link to Macau Peninsula officially opened on 8 December 2023.