Xiaolangdi Dam
| Xiaolangdi Dam | |
|---|---|
| Official name | 小浪底 | 
| Country | China | 
| Location | Jiyuan | 
| Coordinates | 34°55′26″N 112°21′55″E / 34.92389°N 112.36528°E | 
| Status | Operational | 
| Construction began | 1994 | 
| Opening date | 2000 | 
| Construction cost | US$3.5 billion | 
| Owner(s) | Yellow River Water and Hydroelectric Power Development Corporation | 
| Dam and spillways | |
| Type of dam | Embankment, rock-fill | 
| Impounds | Yellow River | 
| Height | 154 m (505 ft) | 
| Width (base) | 1,317 m (4,321 ft) | 
| Reservoir | |
| Total capacity | 12.8 km3 (10,377,129 acre⋅ft) | 
| Maximum length | 130 km (81 mi) | 
| Power Station | |
| Turbines | 6 × 306 MW | 
| Installed capacity | 1,836 MW | 
| Annual generation | 5.1 TWh | 
| Website Official website | |
The Xiaolangdi Dam (Chinese: 小浪底; pinyin: Xiǎolàngdǐ) is a dam in Jiyuan, Henan Province, China, and impounds the Yellow River. The facility is located about 20 km to the northwest of Luoyang. It has a total installed capacity of 1,836 MW and generates up to 5.1 TWh annually with the help of six 306 MW turbines. The dam stands 154 m (505 ft) tall and 1,317 m (4,321 ft) wide. It cost US$3.5 billion to construct.