Hebbagodi metro station

Biocon Hebbagodi
Namma Metro station
Final stages of this metro station as of April 2024
General information
LocationVeerasandra, Hebbagodi, Bommasandra, Karnataka 560099
Coordinates12°49′45″N 77°40′53″E / 12.82909°N 77.68133°E / 12.82909; 77.68133
Owned byNamma Metro
Operated byBangalore Metro Rail Corporation Ltd (BMRCL)
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
ArchitectITD - ITD Cementation India JV
Other information
StatusAwaiting trainsets and ready for operations
Station code(TBC)
History
OpeningAugust 2025 (August 2025) (TBC)
Electrified750 V DC third rail
Previous namesHebbagodi
Services
Preceding station Namma Metro Following station
Huskur Road Yellow Line
(Operational around August 2025)
Bommasandra
Terminus
Location

Biocon Hebbagodi (formerly known as Hebbagodi) is an upcoming elevated metro station on the Yellow Line of the Namma Metro serving the Hebbagodi suburban area of Bengaluru.

In 2020, Biocon Group signed an agreement with the Bangalore Metro Rail Corporation Ltd to contribute 65 crore towards the construction of the metro station and donated land worth 30 crore for the project. Consequently, Biocon obtained the naming rights for the station for 30 years, and the station was renamed from Hebbagodi to Biocon Hebbagodi.

This will also be the depot for all the Yellow Line Namma Metro trains for maintenance purposes. As per latest reports, the Yellow Line is slated to be operational around August 2025 instead of May 2025 which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.