Line 1 (Nanjing Metro)

Line 1
A Line 1 train leaving Andemen
Overview
Other name(s)Tianyin Line
StatusIn operation
LocaleJiangning, Yuhuatai, Qinhuai, Gulou, Xuanwu and Qixia districts
Nanjing, Jiangsu
Termini
  • Baguazhoudaqiaonan
  • CPU
Stations32
Service
TypeRapid transit
Rolling stockAlstom Metropolis
Daily ridership763,000 (2014 Avg.)
1.207 million (2019 Peak)
History
OpenedAugust 12, 2005 (2005-08-12)
Technical
Line length45.4 km (28.2 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed65km/h (Normal), 80km/h (Maximum)
Route map

Erqiaogongyuan Depot
Baguazhoudaqiaonan
Badoushan
Yanziji
Jixiang'an
Xiaozhuang 7 
Xishanqiao  7  Xianxinlu
Maigaoqiao
Hongshan Zoo
Jiangsu Grand Theater·Xianfa Square  9  Hongshanxincheng
Linchang  3 
Nanjing railway station 3  9 
Jinchuan River
Xinmofan­malu
Xuanwumen
Gulou 4 
Zhujianglu
Xinjiekou 2 
Yuzui  2  Jingtianlu
Zhangfuyuan
Sanshanjie 5 
 5  Fangjiaying
Zhonghuamen
 10  Phase 2
Andemen 10 
to  10 
 10  to Yushanlu
Xiaohang Depot
Tianlongsi
Ruanjian­dadao
Huashenmiao
Nanjing South Railway Station  3  6  S1  S3 
( Konggangxinchengjiangning  S1 )
(Qixiashan  6  )
( Gaojiachong  S3 
Shuanglong­dadao
Qinhuai New River
Hedingqiao
Shengtailu
Baijiahu
Xiaolongwan
Zhushanlu 5 
Tianyin­dadao
Longmian­dadao
NMU - JIETT
NJCI
CPU
CPU Depot

Line 1 of the Nanjing Metro (Chinese: 南京地铁1号线; pinyin: Nánjīng Dìtiě Yī Hào Xiàn) is a north-south line and the first operating metro line in the Nanjing Metro system, inaugurated on September 3, 2005. After the opening of the 25.08 km (15.58 mi)-long south extension line on May 28, 2010, the total length of Line 1 is now 37.9 km (23.5 mi), running from CPU to Baguazhoudaqiaonan.