Line 7 (Nanjing Metro)

Line 7
 7 
Overview
StatusIn operation
LocaleQixia, Gulou, Jianye, and Yuhuatai districts
Nanjing, Jiangsu
Termini
  • Xianxinlu
  • Xishanqiao
Stations27
Service
TypeRapid transit
History
Opened28 December 2022 (2022-12-28)
Technical
Line length35.7 km (22.2 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (Maximum)
Route map

Xianxinlu  8 
( Shiyueguangchang  8  Zhonghuamen )
Yaohuamen
Majiayuan Depot
Yaohuaxincun
Dingjiazhuangnan
Dingjiazhuang
Wanshou  6 
( Qixiashan  6  Nanjing South Railway Station )
Xiaozhuang  1 
( Baguazhoudaqiaonan  1  CPU )
Mufushan
Wutang­guangchang  3 
Mufuxilu
( North secton  Central secton )
Zhongfulu  9 
( Jiangsu Grand Theater·Xianfa Square)
( 9  Hongshanxincheng )
Fujianlu  5 
( Fangjiaying  5  Jiyindadao )
Gupinggang
Link line to  4 
Caochangmen / NUA / JSSNU  4 
Qingliangshan
( 2  Jingtianlu )
Mochouhu  2 
Dashichating
Nanhu
Yingtiandajie
( Central Section  South Section )
Mengdudajiedong
Xinchengkejiyuan
Zhongsheng  10 
Go below  2 
Jialinjiangdongjie
Yongchulu  S3 
Taiqinglu
Luotanglu  2 
( Yuzui 2 )
Jianning Station
Xishanqiao S2 
Xishanqiao Stabling Yard
(  S2 Dangtunan)

Line 7 of Nanjing Metro is a northeast–southwest line running roughly parallel to the south bank of the Yangtze River. The line began operation on 28 December 2022. This line is also the first metro line to use GoA4 automated trains in Nanjing.