Line 19 (Chengdu Metro)

Line 19
19
A Line 19 train at Jinxing station
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations18
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Yongyi Depot (永义车辆段)
Wutongmiao Depot (五桐庙停车场)
Changshuncun Depot (长顺村停车场)
History
Opened18 December 2020 (2020-12-18)
Technical
Line length60.139 km (37.4 mi) (in operation)
Number of tracks2
Characterunderground, some elevated
Track gauge1435
Electrificationoverhead lines, 25,000 V AC
Operating speed140km/h

Line 19 of the Chengdu Metro is a metro line in Chengdu. The whole line is 62.69 km. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.

It was opened in 18 December 2020 as a part of Line 17 Phase 1. On September 17, 2023, original Line 17 Phase 1: (Jinxing - Jitouqiao) splits into Line 19 Phase 1: (Jinxing - Jiujiang North) and new Line 17: (Jiujiang North - Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform at Jiujiang North between line 17 and line 19.

Line 19 Phase 2 will have local and express services. It will connect Chengdu Tianfu International Airport and Chengdu Shuangliu International Airport with direct express service. Phase 2 has opened on 28 November 2023, of which Tianfu station will only provide interchange with line 18, and will be fully open when Tianfu railway station of China Railway opens.