Line 19 (Shanghai Metro)

Line 19
 19 
Overview
Other name(s)M9 (planned name)
Native name上海地铁19号线
StatusUnder construction
LocaleBaoshan, Jing'an, Hongkou, Pudong, Xuhui, Minhang
Shanghai
Termini
  • Baoshan Railway Station
  • Hongjian Road
Connecting lines 2   4   6   7   8   9   10   11   12   13   14   15   18   20   23 
Stations34
Websitewww.shmetro.com
Service
Type Rapid transit
System Shanghai Metro
Operator(s)TBA
Depot(s)Chengjiang Road Depot
Tieshan Road Yard
Rolling stockClass A 6-car trains
History
Planned openingJuly 2027 (2027-07)
Technical
Track length46.2 km (28.7 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed80 km/h (50 mph)

Line 19 is an under construction subway line on the Shanghai Metro. Its termini are planned to be Baoshan Railway Station and Hongjian Road. It is planned to be 46.2 km (28.7 mi) in length, with 34 stations. The line hopes to ease car congestion along Pudong South Road, as well as reduce crowding on the southern part of line 8, and the northern sections of lines 1 and 3.

The line was announced by the Municipal government in 2016 and is planned to finish construction between Baoshan Railway Station and Yierba Jinian Road in July 2027. The construction period for the rest of the line was delayed due to construction uncertainties around Tian'ai Road, and the opening date has yet to be determined.