Line 20 (Shanghai Metro)

Line 20
 20 
Overview
Native name上海地铁20号线
StatusUnder construction
LocalePutuo, Baoshan, Jing'an, Yangpu, and Pudong, Shanghai
Termini
  • Jiaotong Road
  • North Xinyuan Road
Connecting lines 1   3   7   8   10   11   15   18   19   21 
Stations21
Websitewww.shmetro.com
Service
Type Rapid transit
System Shanghai Metro
Operator(s)Shanghai No. Metro Operation Co., Ltd.
Depot(s)Zhenru Yard
Huadong Road Depot
Rolling stockClass A 6-car trains
History
CommencedDecember 16, 2022 (2022-12-16)
Planned opening2030 (2030)
Technical
Track length23.8 km (14.8 mi) (Phase 1 full section)
Number of tracks2
CharacterFully underground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed80 km/h (50 mph)

Line 20 will be a future subway line on the Shanghai Metro. It will run in an east–west direction in northern Shanghai, connecting Shanghai West railway station in Jiading District to Gongqing Forest Park in Yangpu District, before extending to North Xinyuan Road in northern Pudong. It will be about 20 km (12 mi) long with 10 stations. The line was announced by the Municipal government in 2016.