Line 4 (Foshan Metro)
| Line 4 | |
|---|---|
| 4 | |
| Overview | |
| Status | Under Construction |
| Owner | Foshan Metro Group |
| Locale | Foshan (Nanhai, Sanshui and Chancheng districts) Guangdong |
| Termini |
|
| Stations | 33 |
| Service | |
| Type | Rapid transit |
| System | Foshan Metro (FMetro) |
| Services | 1 |
| Technical | |
| Line length | 55.2 km (34.3 mi) (Phase 1) |
| Number of tracks | 2 |
| Character | Underground and elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Operating speed | 100 km/h (62 mph) |
Line 4 of Foshan Metro (FMetro) (Chinese: 佛山地铁4号线; pinyin: Fóshān Dìtiě Sì Hào Xiàn) is a line under construction in Foshan. The first phase of the line will run in an L-shaped northwest-east direction, connecting Beijiang Dadao in Sanshui District with Gangkou Lu in Nanhai District, with 33 stations and 55.2 km (34.3 mi) kilometers of track. Construction started on 15 January 2022.
The line is expected to operate 6 car type B trains with a maximum speed of 100km/h, and will be fully automated and driverless.