T3 (Tram İzmir)

T3 Çiğli Tram
Overview
StatusOperating
Ownerİzmir Metropolitan Municipality
Localeİzmir, Turkey
Stations14
Service
TypeLight-rail
SystemTram İzmir
Services2
Route numberT3
Operator(s)İzmir Metro A.Ş.
Depot(s)Mavişehir
History
OpenedJanuary 27, 2024 (2024-01-27)
Technical
Line length12 km (7.5 mi)
Number of tracks2
CharacterLight rail with tram features
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC Overhead line (Overvolted to 875 volts)
Operating speed60 km/h (37 mph)
Highest elevation1 m (3.3 ft)
Route map

Katip Çelebi Üniversitesi (only Red Line)
Evka 5
Ata Sanayi
Çiğli Bölge Hastanesi
Yenimahalle
Eski Havaalanı
Semra Aksu

T3 Çiğli Tram (Turkish: T3 Çiğli Tramvayı) is a 12 km (7.5 mi) urban light rail transit (LRT) system in Çiğli district of İzmir, Turkey and is one of the three lines of Tram İzmir.