Line 10 (Beijing Subway)

Line 10
A Line 10 train entering Haidian Huangzhuang station
Overview
Other name(s)M10 (planned name)
StatusOperational
LocaleHaidian, Chaoyang and Fengtai districts
Beijing
Stations45
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd
Depot(s)Wanliu, Wulu, Songjiazhuang
Rolling stock6-car Type B (DKZ15, DKZ34, DKZ46)
Daily ridership1,931,000 (First Half of 2018 Peak)
2,076,500 (2014 Peak)
History
Opened19 July 2008 (2008-07-19)
Technical
Line length57.024 km (35.4 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC Third rail
Operating speed80 km/h (50 mph)
Route map

Bagou
Wanliu depot
Wanquan river
Suzhou Jie
connects Line 4
Haidian Huangzhuang
Zhichun Li
Zhichun Lu
Jingzhang ICR crossing
Xitucheng
Mudanyuan
Jiande Men
Beitucheng
connects Line 8
Anzhenmen
planned line 8 branch platform
connects Line 8
Huixin Xijie Nankou
connects Line 5
Shaoyaoju
Taiyanggong
Capital Airport Express Terminal 3
line 12 Dongbabei
Sanyuan Qiao
line 12 Sijiqing Qiao
Capital Airport Express Beixinqiao
Liangma Qiao
Liangma river
Agricultural Exhibition Center
Tuanjiehu
Hujialou
Jintai Xizhao
Line 28 (to be opened 2029)
Dongdaqiao-Guangqudonglu
Guomao
Tonghui river
Shuangjing
Jingsong
Panjia Yuan
Jingjin ICR crossing
line 14 Shangezhuang
Shilihe
Fenzhong Si
Chengshou Si
Songjiazhuang yard
connects Yizhuang line
Songjiazhuang
Shiliuzhuang
Liangshui river
Dahong Men
Line 8 (not open)
Jiaomendong
Jiaomenxi
Caoqiao
Lize Shangwuqu (to be opened 2026)Daxing Airport
Ma'cao river
Jinghu HSR crossing
Jijiamiao
Capital Univ. of Economics & Business
Fengtai railway station (subway)
Niwa
Xiju
Liuli Qiao
Jingguang railway Xichang connection
Jingguang HSR crossing
Lianhua Qiao
Gongzhufen
Yongding River diversion canal
Xidiaoyutai
Jingmi diversion canal
Cishou Si
Wulu yard
connects Line 6
Chedaogou
Changchun Qiao
Huoqiying
Jingmi diversion canal

Line 10 of the Beijing Subway (Chinese: 北京地铁10号线; pinyin: běijīng dìtiě shíhào xiàn) is the second loop line in Beijing's rapid transit network as well as the second longest and most widely used line. The line is 57.024 km (35.433 mi) in length, and runs entirely underground through Haidian, Chaoyang and Fengtai Districts, either directly underneath or just beyond the 3rd Ring Road. The Line 10 loop is situated between 2 and 6 kilometres (1.243 and 3.728 mi) outside the Line 2 loop, and intersects with every subways line through the city centre, with 24 transfer stations and 45 stations in all. The line's color is capri.

Upon completion in May 2013, it held the record as the world's longest rapid transit loop line, an accolade it held until March 2023. It remains one of the longest entirely underground subway lines in the world, requiring 104 minutes to complete one full journey in either direction.