Line 11 (Guangzhou Metro)
| Line 11 | |
|---|---|
Line 11 train leaving Chisha station | |
| Overview | |
| Other name(s) | M11 (plan name) Central District Loop Line (Chinese: 中心区环线) |
| Status | Operational |
| Owner | City of Guangzhou |
| Termini | Loop line (Terminal station: Chisha / Longtan) |
| Stations | 31 |
| Service | |
| Type | Rapid transit |
| System | Guangzhou Metro |
| Services | 1 |
| Operator(s) | Guangzhou Metro Corporation |
| History | |
| Opened | 28 December 2024 |
| Technical | |
| Line length | 44.2 km (27.5 mi) |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Operating speed | 80km/h (Maximum) |
Line 11 of the Guangzhou Metro (Chinese: 广州地铁11号线; pinyin: Guǎngzhōu Dìtiě Shíyīhàoxiàn) is a fully automated rapid transit line in Guangzhou. It is a loop line around the city center, connecting Guangzhou railway station, Guangzhou East railway station, Pazhou, and Fangcun. It opened on 28 December 2024, minus the two major railway stations due to issues on China Railways' part.