Line 10 (Guangzhou Metro)

Line 10
A line 10 train
Overview
Other name(s)M10 (plan name)
Wushan line (五山线)
StatusUnder construction
OwnerCity of Guangzhou
Termini
Stations19
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
History
Opened2025 (Xilang to Yangji East, except Sun Yat-sen University South Gate)
Technical
Line length26.9 km (16.7 mi)
including the Wushan section
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h
Route map

 6  to Xiangxue
Tianhe Coach Terminal
 6 
 6  to Xunfenggang
Wushan
South China Normal University
 11 
 11 
Outer Circle
Inner Circle
Gangding
Shipaiqiao
 3  After 2026
Tiyu Xilu
 1   3 
 3 
to Airport North (Terminal 2)
to Panyu Square
 1  to Xilang
 13 
to Chaoyang
to Xinsha
Yangji East
 5  to Wenchong
Wuyangcun
 5 
 5  to Jiaokou
 6  to Xiangxue
Donghu
 6   12 
 6  to Xunfenggang
Binjiang East Road
Haizhu Stream
Sun Yat-sen University South Gate
 11 
Inner Circle
Outer Circle
Wufeng
 11 
Dongxiaonan
 2 
Gongye Avenue South
 Guangfo  (via Shixi)
Daganwei
Yajisha Island
Dongsha
 11 
to Hedong East
to Rongqi Ferry
Huawei
 11 
Guanggang New Town Depot
Future Extension
Xilang
 1   Guangfo   22 
 22  to Fangcun
Line 10
Simplified Chinese广州地铁10号线
Traditional Chinese廣州地鐵10號線
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Shí Hào Xiàn
Bopomofoㄍㄨㄤˇ ㄓㄡ ㄉㄧˋ ㄊㄧㄝˇ ㄕˊ ㄏㄠˋ ㄒㄧㄢˋ
Yue: Cantonese
Jyutpinggwong2 zau1 dei6 tit3 sap6 hou6 sin3

Line 10 of the Guangzhou Metro is a rapid transit rail line currently under construction in Guangzhou. Line 10 will incorporate Line 3's spur line into Line 10 once it becomes operational. Line 10 will connect Tianhe with Liwan via Haizhu. Line 10 mainly runs parallel in-between Line 2 and Line 3 in Haizhu. Line 10 has been under construction since January 2018. The 12-station section from Xilang to Yangji East, except Sun Yat-sen University South Gate, is expected to open in 2025.